Services

We at Tricon Buildwell Pvt Ltd aim to provide best services and high quality of construction work. All our completed works speak of quality and we believe that achieving quality is a continuous process. The quality of our work and services has improved manifold by utilizing our current resources optimally as well as improving upon our machinery.

TIME / RESOURCES PLANNING

Construction projects are time bound. Resources and inputs at the project site include men, material, machinery and finance. These inputs produce outputs in the form of work. The success of a project depends upon the proper management of these inputs.

Generally construction project objectives are stated in terms of project completion time, budgeted cost and stipulated quality specifications We adopt the methodologies for breaking down the project work into activities, duration, estimation, modeling and time analyses of CPM,PERT and precedence networks and prepareation of time/resources limit schedules. Similarily strategies are worked out for planning, manpower, material, plant and machinery ,cost and project budgets to achieve the ultimate goal of timely completion of works with top class quality.

  • CONCEPTS
  • CLIENT ORIENTED.
  • SMART CREATIVITY.
  • TECHNICAL EXCELLENCE AND INNOVATIONS.
  • PROJECT MANAGEMENT FROM A TO Z.

QUALITY CONTROL

We believe in quality works and ensure stringent quality control at site during the execution of works. We have documented quality control system and procedures. We employ experienced and committed technical personnel and tradesmen.

SHUTTERING SYSTEM

We have kept our concentration on developing safe and quality shuttering systems. We can cover a plan area of 1,50000 sq.ft of desired height in one go. The shuttering set up is always updated as per the requirement of heavy industrial/shopping complexes, residential/office multistoried buildings at our office with qualified team of design engineers. Safety norms are always adhered to and kept on priority for designing any shuttering system.

CONTROLLED CONCRETE

We have batching plant and required T and P for achieving highest degree of controlled concrete quality. This is backed by a good testing laboratory to design the mix, test results and all other material testing.

Our Clients
Visitor No.   
Hit Counter